|
|
|
|
|
Click on the image for a larger view. |
PRESENTATION APARTMENT HOTEL NIKMAR - BANSKO, BULGARIA
APARTMENT HOTEL "NIKMAR" is a luxury development in the beautiful mountain resort of Bansko, built in the traditional for the town architectural style. The building is situated in UPI XVI, kv.224, next to the river Glazne, 15 minutes by walking to the historical centre of the Bansko and 25 minutes to the Gondola.
Most of the apartments have beautiful mountain views of either Pirin Mountain or Rila Mountain.
PAYMENT PLAN FOR THE NIKMAR BUILDING
- deposit - 1000 Euro
- first installment - 30% within 30 days on signing of the preliminary contract
- second installment - 30% - 3 months later
- third installment - 30% - 3 months later
- fourth installment - 10% - on signing of the notary deed
FACILITIES
- Fitness hall
- Sauna
- Ski wardrobe
- Reception
PRICE LIST OF THE NIKMAR BUILDING
See (or download) the price list together with detailed description [in PDF format from here]
FLOORPLANS
Download all floor plans of the Nikmar building [in ZIP format from here]
(To download each floor plan separately right-click on the corresponding link below and choose "Save Target As...")
STANDARD FINISHING OF THE APARTMENTS:
Entrance Hall:
|
flooring - terra-cotta
ceilings - plaster coating and latex
walls - plaster coating and latex |
Bathroom:
|
flooring -terra-cotta
walls - faience and plaster
ceiling - plaster
sanitary unit - toilet, sink, mixing tap, mirror, boiler |
Living room/Bedroom/Kitchen
|
floor - laminated parquet
ceilings - plaster coating and latex
walls - plaster coating and latex |
Others:
|
Joinery - PVC
Inside doors - MDF material-type of covering
Water-piping and sewage, water-meters
All parts of building - full finished, walls-painted, floor-granite
Facade - finished according to the architectural plan
Parking space |
MAINTENANCE
Annual maintenance fee of 10 EURO per sq.m. which includes:
- Sanitary hygienic maintenance of common parts - two times a week
- 24 hours security
- Mini bus to the lift station and back
- Organizing and managing the payment of all running costs for use of the public areas and systems (electricity and water supply)
CONSTRCTION UPDATE
 |
 |
 |
 |
| May, 2009 |
May, 2009 |
May, 2009 |
May, 2009 |
 |
 |
 |
 |
| May, 2009 |
May, 2009 |
May, 2009 |
May, 2009 |
DATE OF COMPLETION
March, 2008 year.
|